CANDID
Availability: | |
---|---|
Quantity: | |
Mine Elevator shaft
Key Features
Design capability for high speed conveying service in mine shaft
Variable design & fabrication solutions, covering Guides & Buntons, Concrete Buckets, Forms
& Rings, Galloways, Rubber-lined Plateworks etc.
Heavy duty hot-dipped galv. or coated as per customers' requirements
Specifiction | ||
1 | Range of Length | 500m-2000m |
2 | Speed | 12-15m/s |
3 | Tolerance scope | Within 1mm for 1km |
4 | Price | $2200-3000/t |
Candid offers 3D modeling design to fit every application.
Based on the experienced engineering & design teams, Candid is dedicated to customized design that
fulfils customers' demands on the shaft steelwork.
Shaft is the an essential part of the support and supply system for the work flow underground.Ventilatio
n doors wll guide an adequate supply of men and material.
Guides & Buntons Concrete Bucket Sinking Buckets & Baskets Galloway
When it comes to the Guides & Buntons,all juctions are assembled by a large number of huck bolts whi
ch can ensure the stability of the shaft walls. Whether concreting from the buttom up or the top down, it
can be an important part of your time and cost cutting operation.
As for the Galloway that is used to dig the shaft of the mine. It's like a giant elevator that can carry the e
quipment and the men.
The shaft lining system of Candid is sealed with seamless and spray polymer around each panel. When the liner is constructed and and the panels are bolted together, the polymer seals of each panel aligned and compressed when the bolts are fixed well. This allows you to tighten the bolts so that all loads are transmitted through the steel and steel contact of the panels.
Before assembly, applying an active chemical to the seal can connect the seals of each panel and become a complete seal shortly after assembly. The formation of solid joints means that the impermeability of the seal does not depend on the high compression level required to maintain the elastic liner between traditional surfaces.
Compared to the traditional designs, Candid shift lines are not affected by vibrations caused by the operation of jigs above and under the mine shaft. Polymer seals have high deformability and can adapt to movement within the shaft. Vibration will be absorbed by elastic materials, which will reduce the stress between light steel and polymers. This elastic material works to provide a flexible water seal that can adapt to small movements inside the shaft due to thermal effects, vibration, or other reasons without affecting the waterproof sealing of the shaft.
Candid's shaft steelwork is fabricated, pre-assembled and tested in the workshops, which can optimize th
e fabrication processes, improve the product quality and highly reduces the site construction workload an
d schedule.
Project Execution:
Project Planning & Scheduling Document Control
Sourcing, Procurement Field Installation & Commissioning Supervision
Fabrication, Expediting, Inspection Performance Evaluation
Shaft #2 10m Concrete Forms and Rings, OT Project, 2012
Manufacturing Notes:
1.GENERAL FABRICATION TOLERANCE IS +/- 1.5mm UNLESS OTHERWISE NOTE.
2.SPECIFIC TOLERANCES ARE AS FOLLOWS:
FORM PANEL RADIUS: +5mm, -0mm CURB RING RADIUS: +/- 1.5 mm.
3.THE RADIUS TOLERANCE IS TO MEASURED FROM THE CENTER OF THE SHAFT FORMS.THE
FABRICATOR IS TO PROVIDE SCRIBE MARKS ON THE TOP OF THE CURB RING AND EACH FORM RING BE USED TO FACILITATE LOCATION OF THE FORM CENTER.
4.THE SPECIFIED TOLERANCES ARE GLOBAL SPECIFIED RADIUS TOLERANCE FOR THE BOTTOM RING NOT TO BE EXCEEDED,WHEN DROPPING THE PLUMB LINE FROM THE TOP RING.
Guarantee and after-service:
1. Guarantee time:one year since machine was at buyer's factory within 12 months against B/L date.
2. We can send our best technician to buyer's factory for installation, debugging and training.
3. Complete installation instructions, circuit diagram, manual operations and machine layout.
Performance:
LIST OF TYPICAL PROJECTS | ||||||||
Modular Solutions | Duration of Product & Services Provision | |||||||
Project | Project Location | Industry | Client/End User | Scope of Supply | Scope of Work | Start | Finish (Actual or Expected) | |
Iron Bridge Project | Australia | Iron Mine | FMG Magnetite Pty Ltd | Supply of Isolation Gates | Design, Supply & Field Services | 2020/02/12 | Current | |
Tripper Car Rejuvenation Project | Singarpore | Gas | Shell Eastern Petroleum (Pte) Ltd | Tripper Car Conveyor, Modulerized Belt Conveyor | Design, Supply & Field Services | 2019/01/21 | 2019/09/30 | |
MdA Expansion Phase 1 | Argentina | Chemical | FMC Corporation | Modularized RO package & IOX package | Design, Supply & Field Services | 2018/12/25 | Current | |
DSM BHT Modification | Shanghai, China | Chemical | DSM (Shanghai) LLC | Modularized Processing Water Skid | EPC | 2018/11/12 | 2019/05/15 | |
Cabot Inner Mongolia Project | Wuhai, China | Chemical | Cabot LLC | Modularized Water Treatment Skid | Design, Supply & Field Services | 2018/02/08 | 2018/08/30 | |
Corning WH/GZ Project | Wuhan & Guangzhou | LCD/Glass | Corning Display Technologies (China) | Modularized Water Treatment Skid | Design, Supply & Field Services | 2018/03/01 | 2018/10/20 | |
Oyu Tolgoi Expansion Project | Oyu Tolgoi, Mongolia | Copper Mine | Oyu Tolgoi LLC | Modularized Water Treatment Skid, Pump Station | Design, Supply & Field Services | 2017/04/15 | 2017/09/10 | |
Oyu Tolgoi Expansion Project | Oyu Tolgoi, Mongolia | Copper Mine | Oyu Tolgoi LLC | Belt Conveyors, Mine Air Lock Systems, includig Mine Vent Door, Hydraulic Power Packs, Controls & Accessories, | Design, Supply & Field Services | 2016/02/15 | Current | |
Nyrstar Port Pirie Expansion | Adleide, Australia | Zinc Mine/Mill | Nyrstar Port Pirie Pty Ltd | Modular Shuttle Conveyors, Feeder Conveyors | Design, Supply & Field Services | 2014/06/10 | 2016/07/01 | |
Oriental Demineralized Water Project | Yangzhou, China | Chemicals | Oriental Petrochemical (Yangzhou) Corp. | Modular Demin Water Plant | EPC | 2014/01/10 | 2014/12/28 | |
Kazakhmys Aktogay Copper Project | Aktogay, Kazakhstan | Copper Mine | Kazakhmys Aktogay LLC | Modularize/Containerized Water Treatment Systems, Potable Water Skids | Design, Supply & Field Services | 2014/05/08 | 2016/08/30 | |
Oyu Tolgoi Project | Oyu Tolgoi, Mongolia | Copper Mine | Oyu Tolgoi LLC | Modularized Sewage Water Treatment Plant | Design, Supply & Field Services | 2012/08/06 | 2013/03/17 | |
Fuel Gas Power Plant | Iraq | Power Plant | Al Hartha, Mobile Power Plant / GE | Demin Water Plant | Design & Supply | 2012/02/17 | 2012/05/10 | |
DSM Zealand Project | Jilin China | Biochemical | DSM (Changchun) | Scraper Conveyors, Screw Conveyors | Design, Supply & Field Services | 2011/03/10 | 2011/07/15 | |
Fuel Gas Power Plant | Iraq | Power Plant | Al Hartha, Mobile Power Plant / GE | Demin Water Plant | Design, Supply & Field Services | 2012/02/17 | 2012/05/10 | |
Dalian Dehao LED Project | Dalian, China | LED | Dehao Technology (Dalian) Co., Ltd. | DI Water Plant | EPC | 2011/02/18 | 2011/12/15 | |
YK Technology Suzhou Plant | Suzhou, China | Electronics | YK Technology (Suzhou) Co., Ltd. | DI Water Plant | EPC | 2010/05/08 | 2010/11/19 | |
Terumo Hangzhou FA Improvement | Hangzhou, China | Medicals | Terumo Hangzhou | Automated Conveyors and Assembling Line | Design, Supply & Field Services | 2010/02/05 | 2010/12/25 | |
AKZO NOBEL HCN Plant Project | Ningbo, China | Chemicals | AKZO NOBEL Chemicals (Ningbo) Co.Ltd | Skid-mounted Steam Temperature & Pressure Reducer Unit | Design, Supply & Field Services | 2009/04/11 | 2009/07/02 | |
PTFE Micro Powder Plastic Project | Changshu, China | Chemicals | Solvay Specialty Polymers (Changshu) Co., Ltd. | Pneumatic Box Tilters | Design, Supply & Field Services | 2007/12/17 | 2008/05/10 | |
Fabrications | Duration of Product & Services Provision | |||||||
Project | Project Location | Industry | Client/End User | Scope of Supply | Scope of Work | Start | Finish (Actual or Expected) | |
Oyu Tolgoi Expansion Project | Oyu Tolgoi, Mongolia | Copper Mine | Oyu Tolgoi LLC | Shaft #2 Shaft Guides and Steelwork, Ore Bins & Chutes, Concrete Buckets, Monorails, and other Steel Structures | Shop Details, Fabrication & Supply | 2016/02/15 | 2018/06/01 | |
Corning Hefei Batch Plant | Hefei, China | LCD/Glass | Corning Hefei | Batch Equipment, Magnet Separators, Hoppers/Chutes/Bins c/w Various Liners, Feeders, Mixers | Shop Details, Fabrication, Supply & Field Services | 2016/09/30 | 2017/06/20 | |
Nyrstar Port Pirie Expansion | Adleide, Australia | Zinc Mine/Mill | Nyrstar Port Pirie Pty Ltd | Fully Assembled Sinter Pallets, Chutes & Hoppers, | Shop Details, Fabrication & Supply | 2014/06/10 | 2016/07/01 | |
Oyu Tolgoi Project | Oyu Tolgoi, Mongolia | Copper Mine | Oyu Tolgoi LLC | Shaft Guides & Buntons, Concrete Forms & Rings, Buckets, Ductwork, Rubber-lined Plateworks, Steel Structures | Shop Details, Fabrication & Supply | 2009/04/06 | 2014/03/20 | |
Sabic Thermo Plastics Production Project | Chongqing, China | PP | Sabic Innovative Plastics (Chongqing) Co., Ltd. | Hoppers, Chutes, Static Equipment | Shop Details, Fabrication & Supply | 2012/08/18 | 2013/06/17 | |
CDT M3 HPD UPGRADES 2012 | Japan | LCD/Glass | Corning USA / Copp,CherylL | Batch Equipment, Magnet Separators, Hoppers/Chutes/Bins c/w Various Liners, Feeders, Mixers | Shop Details, Fabrication, Supply & Field Services | 2012/09/19 | 2012/12/20 | |
Corning Phase II Project (Beijing) | Beijing, China | LCD/Glass | Corning Display Technologies (China) | Batch Equipment, Bins, Chutes, Glass Unloader & Other Plateworks, Conveyors | Shop Details, Fabrication, Supply & Field Services | 2011/08/10 | 2012/12/19 | |
Services | Duration of Product & Services Provision | |||||||
Project | Project Location | Industry | Client/End User | Scope of Supply | Scope of Work | Start | Finish (Actual or Expected) | |
Yearly Spare Parts | Saudi Arabi | Petrochemical | Aramco Asia | Spare Parts for Demin Water Plant | Sourcing & Procurement | 2017/02/01 | Current | |
GVC OEM Valves | Wenzhou, Shanghai, Jiangsu | Valves | Global Valves Controls, USA | Services | Inspection & Expediting | 2009/11/12 | Current | |
Oyu Tolgoi Project | Oyu Tolgoi, Mongolia | Copper Mine | Jacobs Shanghai | Engineering Services | Shop Detail Design, Calculations | 2013/05/10 | 2013/06/05 | |
Bayer Hangzhou Factory | Hangzhou, China | Chemical Engineering | Bayer Hangzhou | Misc Materials, Equipment | Sourcing & Procurement | 2008/05/02 | 2008/10/07 | |
Mine Elevator shaft
Key Features
Design capability for high speed conveying service in mine shaft
Variable design & fabrication solutions, covering Guides & Buntons, Concrete Buckets, Forms
& Rings, Galloways, Rubber-lined Plateworks etc.
Heavy duty hot-dipped galv. or coated as per customers' requirements
Specifiction | ||
1 | Range of Length | 500m-2000m |
2 | Speed | 12-15m/s |
3 | Tolerance scope | Within 1mm for 1km |
4 | Price | $2200-3000/t |
Candid offers 3D modeling design to fit every application.
Based on the experienced engineering & design teams, Candid is dedicated to customized design that
fulfils customers' demands on the shaft steelwork.
Shaft is the an essential part of the support and supply system for the work flow underground.Ventilatio
n doors wll guide an adequate supply of men and material.
Guides & Buntons Concrete Bucket Sinking Buckets & Baskets Galloway
When it comes to the Guides & Buntons,all juctions are assembled by a large number of huck bolts whi
ch can ensure the stability of the shaft walls. Whether concreting from the buttom up or the top down, it
can be an important part of your time and cost cutting operation.
As for the Galloway that is used to dig the shaft of the mine. It's like a giant elevator that can carry the e
quipment and the men.
The shaft lining system of Candid is sealed with seamless and spray polymer around each panel. When the liner is constructed and and the panels are bolted together, the polymer seals of each panel aligned and compressed when the bolts are fixed well. This allows you to tighten the bolts so that all loads are transmitted through the steel and steel contact of the panels.
Before assembly, applying an active chemical to the seal can connect the seals of each panel and become a complete seal shortly after assembly. The formation of solid joints means that the impermeability of the seal does not depend on the high compression level required to maintain the elastic liner between traditional surfaces.
Compared to the traditional designs, Candid shift lines are not affected by vibrations caused by the operation of jigs above and under the mine shaft. Polymer seals have high deformability and can adapt to movement within the shaft. Vibration will be absorbed by elastic materials, which will reduce the stress between light steel and polymers. This elastic material works to provide a flexible water seal that can adapt to small movements inside the shaft due to thermal effects, vibration, or other reasons without affecting the waterproof sealing of the shaft.
Candid's shaft steelwork is fabricated, pre-assembled and tested in the workshops, which can optimize th
e fabrication processes, improve the product quality and highly reduces the site construction workload an
d schedule.
Project Execution:
Project Planning & Scheduling Document Control
Sourcing, Procurement Field Installation & Commissioning Supervision
Fabrication, Expediting, Inspection Performance Evaluation
Shaft #2 10m Concrete Forms and Rings, OT Project, 2012
Manufacturing Notes:
1.GENERAL FABRICATION TOLERANCE IS +/- 1.5mm UNLESS OTHERWISE NOTE.
2.SPECIFIC TOLERANCES ARE AS FOLLOWS:
FORM PANEL RADIUS: +5mm, -0mm CURB RING RADIUS: +/- 1.5 mm.
3.THE RADIUS TOLERANCE IS TO MEASURED FROM THE CENTER OF THE SHAFT FORMS.THE
FABRICATOR IS TO PROVIDE SCRIBE MARKS ON THE TOP OF THE CURB RING AND EACH FORM RING BE USED TO FACILITATE LOCATION OF THE FORM CENTER.
4.THE SPECIFIED TOLERANCES ARE GLOBAL SPECIFIED RADIUS TOLERANCE FOR THE BOTTOM RING NOT TO BE EXCEEDED,WHEN DROPPING THE PLUMB LINE FROM THE TOP RING.
Guarantee and after-service:
1. Guarantee time:one year since machine was at buyer's factory within 12 months against B/L date.
2. We can send our best technician to buyer's factory for installation, debugging and training.
3. Complete installation instructions, circuit diagram, manual operations and machine layout.
Performance:
LIST OF TYPICAL PROJECTS | ||||||||
Modular Solutions | Duration of Product & Services Provision | |||||||
Project | Project Location | Industry | Client/End User | Scope of Supply | Scope of Work | Start | Finish (Actual or Expected) | |
Iron Bridge Project | Australia | Iron Mine | FMG Magnetite Pty Ltd | Supply of Isolation Gates | Design, Supply & Field Services | 2020/02/12 | Current | |
Tripper Car Rejuvenation Project | Singarpore | Gas | Shell Eastern Petroleum (Pte) Ltd | Tripper Car Conveyor, Modulerized Belt Conveyor | Design, Supply & Field Services | 2019/01/21 | 2019/09/30 | |
MdA Expansion Phase 1 | Argentina | Chemical | FMC Corporation | Modularized RO package & IOX package | Design, Supply & Field Services | 2018/12/25 | Current | |
DSM BHT Modification | Shanghai, China | Chemical | DSM (Shanghai) LLC | Modularized Processing Water Skid | EPC | 2018/11/12 | 2019/05/15 | |
Cabot Inner Mongolia Project | Wuhai, China | Chemical | Cabot LLC | Modularized Water Treatment Skid | Design, Supply & Field Services | 2018/02/08 | 2018/08/30 | |
Corning WH/GZ Project | Wuhan & Guangzhou | LCD/Glass | Corning Display Technologies (China) | Modularized Water Treatment Skid | Design, Supply & Field Services | 2018/03/01 | 2018/10/20 | |
Oyu Tolgoi Expansion Project | Oyu Tolgoi, Mongolia | Copper Mine | Oyu Tolgoi LLC | Modularized Water Treatment Skid, Pump Station | Design, Supply & Field Services | 2017/04/15 | 2017/09/10 | |
Oyu Tolgoi Expansion Project | Oyu Tolgoi, Mongolia | Copper Mine | Oyu Tolgoi LLC | Belt Conveyors, Mine Air Lock Systems, includig Mine Vent Door, Hydraulic Power Packs, Controls & Accessories, | Design, Supply & Field Services | 2016/02/15 | Current | |
Nyrstar Port Pirie Expansion | Adleide, Australia | Zinc Mine/Mill | Nyrstar Port Pirie Pty Ltd | Modular Shuttle Conveyors, Feeder Conveyors | Design, Supply & Field Services | 2014/06/10 | 2016/07/01 | |
Oriental Demineralized Water Project | Yangzhou, China | Chemicals | Oriental Petrochemical (Yangzhou) Corp. | Modular Demin Water Plant | EPC | 2014/01/10 | 2014/12/28 | |
Kazakhmys Aktogay Copper Project | Aktogay, Kazakhstan | Copper Mine | Kazakhmys Aktogay LLC | Modularize/Containerized Water Treatment Systems, Potable Water Skids | Design, Supply & Field Services | 2014/05/08 | 2016/08/30 | |
Oyu Tolgoi Project | Oyu Tolgoi, Mongolia | Copper Mine | Oyu Tolgoi LLC | Modularized Sewage Water Treatment Plant | Design, Supply & Field Services | 2012/08/06 | 2013/03/17 | |
Fuel Gas Power Plant | Iraq | Power Plant | Al Hartha, Mobile Power Plant / GE | Demin Water Plant | Design & Supply | 2012/02/17 | 2012/05/10 | |
DSM Zealand Project | Jilin China | Biochemical | DSM (Changchun) | Scraper Conveyors, Screw Conveyors | Design, Supply & Field Services | 2011/03/10 | 2011/07/15 | |
Fuel Gas Power Plant | Iraq | Power Plant | Al Hartha, Mobile Power Plant / GE | Demin Water Plant | Design, Supply & Field Services | 2012/02/17 | 2012/05/10 | |
Dalian Dehao LED Project | Dalian, China | LED | Dehao Technology (Dalian) Co., Ltd. | DI Water Plant | EPC | 2011/02/18 | 2011/12/15 | |
YK Technology Suzhou Plant | Suzhou, China | Electronics | YK Technology (Suzhou) Co., Ltd. | DI Water Plant | EPC | 2010/05/08 | 2010/11/19 | |
Terumo Hangzhou FA Improvement | Hangzhou, China | Medicals | Terumo Hangzhou | Automated Conveyors and Assembling Line | Design, Supply & Field Services | 2010/02/05 | 2010/12/25 | |
AKZO NOBEL HCN Plant Project | Ningbo, China | Chemicals | AKZO NOBEL Chemicals (Ningbo) Co.Ltd | Skid-mounted Steam Temperature & Pressure Reducer Unit | Design, Supply & Field Services | 2009/04/11 | 2009/07/02 | |
PTFE Micro Powder Plastic Project | Changshu, China | Chemicals | Solvay Specialty Polymers (Changshu) Co., Ltd. | Pneumatic Box Tilters | Design, Supply & Field Services | 2007/12/17 | 2008/05/10 | |
Fabrications | Duration of Product & Services Provision | |||||||
Project | Project Location | Industry | Client/End User | Scope of Supply | Scope of Work | Start | Finish (Actual or Expected) | |
Oyu Tolgoi Expansion Project | Oyu Tolgoi, Mongolia | Copper Mine | Oyu Tolgoi LLC | Shaft #2 Shaft Guides and Steelwork, Ore Bins & Chutes, Concrete Buckets, Monorails, and other Steel Structures | Shop Details, Fabrication & Supply | 2016/02/15 | 2018/06/01 | |
Corning Hefei Batch Plant | Hefei, China | LCD/Glass | Corning Hefei | Batch Equipment, Magnet Separators, Hoppers/Chutes/Bins c/w Various Liners, Feeders, Mixers | Shop Details, Fabrication, Supply & Field Services | 2016/09/30 | 2017/06/20 | |
Nyrstar Port Pirie Expansion | Adleide, Australia | Zinc Mine/Mill | Nyrstar Port Pirie Pty Ltd | Fully Assembled Sinter Pallets, Chutes & Hoppers, | Shop Details, Fabrication & Supply | 2014/06/10 | 2016/07/01 | |
Oyu Tolgoi Project | Oyu Tolgoi, Mongolia | Copper Mine | Oyu Tolgoi LLC | Shaft Guides & Buntons, Concrete Forms & Rings, Buckets, Ductwork, Rubber-lined Plateworks, Steel Structures | Shop Details, Fabrication & Supply | 2009/04/06 | 2014/03/20 | |
Sabic Thermo Plastics Production Project | Chongqing, China | PP | Sabic Innovative Plastics (Chongqing) Co., Ltd. | Hoppers, Chutes, Static Equipment | Shop Details, Fabrication & Supply | 2012/08/18 | 2013/06/17 | |
CDT M3 HPD UPGRADES 2012 | Japan | LCD/Glass | Corning USA / Copp,CherylL | Batch Equipment, Magnet Separators, Hoppers/Chutes/Bins c/w Various Liners, Feeders, Mixers | Shop Details, Fabrication, Supply & Field Services | 2012/09/19 | 2012/12/20 | |
Corning Phase II Project (Beijing) | Beijing, China | LCD/Glass | Corning Display Technologies (China) | Batch Equipment, Bins, Chutes, Glass Unloader & Other Plateworks, Conveyors | Shop Details, Fabrication, Supply & Field Services | 2011/08/10 | 2012/12/19 | |
Services | Duration of Product & Services Provision | |||||||
Project | Project Location | Industry | Client/End User | Scope of Supply | Scope of Work | Start | Finish (Actual or Expected) | |
Yearly Spare Parts | Saudi Arabi | Petrochemical | Aramco Asia | Spare Parts for Demin Water Plant | Sourcing & Procurement | 2017/02/01 | Current | |
GVC OEM Valves | Wenzhou, Shanghai, Jiangsu | Valves | Global Valves Controls, USA | Services | Inspection & Expediting | 2009/11/12 | Current | |
Oyu Tolgoi Project | Oyu Tolgoi, Mongolia | Copper Mine | Jacobs Shanghai | Engineering Services | Shop Detail Design, Calculations | 2013/05/10 | 2013/06/05 | |
Bayer Hangzhou Factory | Hangzhou, China | Chemical Engineering | Bayer Hangzhou | Misc Materials, Equipment | Sourcing & Procurement | 2008/05/02 | 2008/10/07 | |