+86-13957112308    zmec@china-equipments.com
YOU ARE HERE: HOME » RESOURCES » FAQ » Nail Making Machine
FAQ
  • Q Is it possible to dispatch an engineer of yours to arrive our factory at the same time with the machines so it can start to install and with production immediately?

    A Yes, 1 technician and 1 interpreter will be assigned to coordinate installation, commissioning and training, for around 7 working days, your side will supply the air return tickets, food, accommodation, transportation, communication, insurance, tax (if have) for the technician and the interpreter. 
    USD80.00/day/person working fee will be paid to them.
  • Q How long does it take to train a skilled operator? How can we have the operator trained?

    A It needs at least 7 days to train. You can dispatch your worker to our factory or we dispatch our technician to your factory to train.
  • Q About the guarantee, do the machines have the same guarantee if working in two shifts?

    A The machines have the same warranty if working in two shifts.
  • Q How long do you guarantee machines? What are the guarantee details?

    A 12 months after commissioning or 18months after shipment. Whichever first is in valid. (It is excluding wear parts. Shipping cost for parts to be replaced during warranty period has to be borne by the customer.)
  • Q How do you package the machine?

    A We pack the machines by wooden cases usually.
  • Q What is raw material used for the Nail washing machine?

    A The material is sawdust (wood dust) and paraffin wax.
  • Q Is there any specific temperature required for machines?

    A There is no specific temperature required; machines can work from -10 to 40.
  • Q Can you supply raw material for the machines; is it possible to send some with machines, what is price?

    A We can help you send some raw material with machines; the price will be around US$900.00/ton. But we suggest you purchase the wire from Ukraine or Russia, theirs price is lower than China. 
  • Q What is the consumption of the NAIL MOULD, NAIL CUTTER & PUNCH PIN?

    A It is around 2 pairs each month if the machine works 8h/day.
  • Q How can we produce another size of nail by same machine?

    A Changing the nail mould and adjusting the wire feeding length. It will take around 15 minutes .
  • Q Can one machine produce all size of nails?

    A No, each Model of machine can produce the size of nail in a certain range, you can refer the Quotation..
  • Q Can the machine be used continuously 24hours a day? What is the maintenance time required?

    A The machines can be used continuously 24hours a day, and they need maintenance one or two times every month.
  • Q What is the scrap (production waste) volume during manufacturing?

    A The rate of production waste is less than 1%.
  • Q What is the power supply of your machine?

    A The power supply is 380V; 3-Phase, 50Hz, but we can design the power supply of machine according to your state grid.
Leave a Message
GET IN TOUCH WITH US
A Full Line Machinery Service Center
HOME
CANDID has an experienced design, marketing and after-sales service team

Products

Contact

+86-13957112308
 +86-571-87031097
  zmec@china-equipments.com
  RM.1405, NO.346 Qingtai Street Hangzhou

Subscribe

Copyright © 2021 Hangzhou Candid I/e Co., Ltd  All rights reserved. Sitemap  Support by Leadong.