Shape of Clip: | |
---|---|
Length of Clip: | |
Capacity: | |
Quantity: | |
TROMBONE PAPER CLIP MAKING MACHINE
Please do send inquiry to our email :zmec@china-equipments.com
RWH Series of Paper Clips Making Machine is suitable for making a series of metallic round and triangular clips and plastic-coated clips by exchanging the die holders.And the clips can be made in one step.
Main Technical Parameter of Paper Clip Making Machine
Model | Shape of Clip | Length of Clip | Dia. Steel wire | Motor | Capacity | Dimension(mm) | Weight |
RWB-U22 | 22mm | 0.80mm | 380V/50Hz/1.1kw | 170pcs./min | 1200x800x1200 | 500kg | |
RWB-U26 | 26mm | ||||||
RWB-U29 | 29mm | ||||||
RWB-U31 | 31mm | ||||||
RWB-U33 | 33mm | ||||||
RWB-U50 | 50mm | 1.2mm | 150pcs./min | ||||
RWC-26 | 26mm | 0.80mm | 380V/50Hz/1.1kw | 170pcs./min | 1200x800x1200 | 500kg | |
RWC-29 | 29mm | ||||||
RWC-31 | 31mm | ||||||
RWC-50 | 50mm | 1.2mm | 150pcs./min | ||||
RWH-25 | 25mm | 0.80mm | 380V/50Hz/1.1kw | 170pcs./min | 1200x800x1200 | 500kg | |
RWH-28 | 28mm | ||||||
RWH-31 | 31mm |
Paper Clip Making Machine Product Show
FAQ
Q: What is the power supply does each type of your machine use?
A: The power supply is 380V; 3-Phase, 50Hz, but we can design the machine according to your requirement.
Q: What is the scrap (production waste) volume during manufacturing?
A: There is few scrap during manufacturing, the rate of production waste is less than 1%.
Q: Does one machine only make one size of clip?
A: Yes, one machine only make one size, you can change the Mould to produce another size.
Q: What is the price of Mould?
A: The price of Mould is US$1,800.00/set
Q: What size wire should be used in the production of clips U26, U33, U50?
A: The regular wire Dia. is 0.8-1.04mm.
Q: What is the raw material for clip?
A: The raw materail is Nickel plated wire (0.8-1.04mm), Rm= 700-800 MPa.
Q: How do you package the machine?
A: We pack the machine by wooden case commonly for protection.
Q: How long does it take to train a skilled operator? How can we have the operator trained?
A: It needs at least 7 days to train. You can send your worker to our factory or we send our technician to your factory to train.