Quantity: | |
---|---|
Tubular-Type Stranding Machine
Please do send inquiry to our email :zmec@china-equipments.com
Tubular stranding machine is used for stranding the steel wires, aluminum wires and copper wires, as well as stranding of control cables
Machine adopts full bearing type for supporting. The middle of machine is supported by a big bearing and fully lubricating by gear pump powered by individual motor. The big bearing in the middle of machine adopts mechanical sealing that is reliable and no oil leak. This type of support will be reduce the oil usage 500kg to 80kg per year.
Type | JGGA-200/6 | JGGA-200/12 | JGGA-250/6 | JGGA-250/12 | |
Payoff Drum | 200 | 250 | |||
Inlet Wire | Cu Dia. | 0.2-0.85 | |||
Al Dia. | |||||
St Dia. | 0.2-0.8 | 0.23-0.8 | |||
Strands | 1.6 | ||||
Outer Dia. | 4.8 | 8 | 4.8 | 8 | |
Pitch Range | 6-79 | 10-100 | |||
Barrel(r/min) | 100-1000 | 60-600 | 100-1000 | 60-600 |
Type | JGGA-400/6 | JGGA-400/12 | JGGA-500/6 | JGGA-500/12 | |
Payoff Drum | 400 | 500 | |||
Inlet Wire | Cu Dia. | 0.5-2.5 | 1.5-3.5 | ||
Al Dia. | 1.0-2.5(4.0) | 1.5-4.0 | |||
St Dia. | 0.5-2.0 | 1.2-3.5 | |||
Strands | 3.5 | 5 | |||
Outer Dia. | 10 | 18 | 15 | 25 | |
Pitch Range | 20-175 | 25-219 | 30-300 | ||
Barrel(r/min) | 60-600 | 50-500 | 50-500 | 35-350 |
Wherever you are, CANDID has the experience, knowledge, and skills to meet your needs and satisfy your requirements.
FAQ
Q : What is the machine power?
A:Our machine is 380V three phases , 50HZ, we could change the current to 220V three phased or 440V three phased etc(change different current will have extra cost )
Q: How many wires can be stranded together?
A: We have two type, one is for 6 wires and the other is for 12 wires.
Q: What’s the material can be used for standing?
A: Tubular stranding machine is used for stranding the steel wires, aluminum wires and copper wires, as well as stranding of control cables.
Q: Requirement of compressed air?
A: Air pressure is 0.6Mpa and Air flow is 1.0m³/min.
Q: What is the delivery time?
A: The delivery is within 80 days after receipt of the down payment.