  • Q gabion machine installation and preparation job

    A
    1. According to the layout diagram fixing the equipment.
    2.Prearrange the payoff frames in concordance with the pay off drawing.
    3.Connect to the Main switch which suite for total power 30KW. We suggest to use 18mm2 copper cable
    4.Enough power cord from Main switch to Electric Control Box.
    5.One set of 0.8MPA,0.6m3/MIN air compressor.
    6.1000KGS of 2.7mm wire , 500KGS of 3.4mm wire.
    7.200KGS lubricant.