Home > FAQ > Wire Drawing Machine >
Q: How long does it take of the installation and trial running of wire drawing machine take?
Q: How long does it take of the installation and trial running of wire drawing machine take?
Update Time:2017-07-07
Q: How long does it take of the installation and trial running of wire drawing machine take?
A: If foundation and everything is prepared, time of installation and trial running is about 10 working days. Then it can be put into usage.