Q: How long does it take of the installation and trial running of wire drawing machine take?

Q: How long does it take of the installation and trial running of wire drawing machine take?
Update Time:2017-07-07

Q: How long does it take of the installation and trial running of wire drawing machine take?


A: If foundation and everything is prepared, time of installation and trial running is about 10 working days. Then it can be put into usage.